< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=1123222801374518&ev=PageView&noscript=1" />
Cell/Whatsapp: 0086 18274950733 Send Message Service call in India:+919619825103
Language

Shipment and Onsite

China Railway Burean Group – Retractable Tunnel Formwork System

Publication Date: 2018-03-26
  1. Customized Tunnel Formwork System is available.
  2. The Project introduction: China Railway Burean Group – Retractable Tunnel Formwork System

– This Expressway Project is conducted by China Railway Burean Group.

– Total expressway length is 15.5km,the designed driving speed 100km/h and integral subgrade width 33.5m,

– Two tunnels are built, left tunnel length 5181m, right tunnel length 5120m.

 

Request a quote