HDD Machine industry related News–the second line of PetroChina’s West-East Gas Pipeline from Guangzhou to Nanning Branch started production. So far, all the 1 main line and 8 branch lines of the second line of the West-East Gas Pipeline Project have been completed and put into operation, realizing the connection of 20 pipelines under construction in China, forming a natural gas pipeline network of nearly 40,000 kilometers, basically covering 28 provinces, regions and cities in China Special administrative regions benefit from hundreds of millions of people.
The West-East Gas Transmission Line is China’s first strategic channel project to introduce overseas natural gas resources. It is also the world’s longest natural gas pipeline with the longest route, the largest engineering volume, and the highest steel grade. The pipeline starts at the first station in Horgos, Xinjiang, passes 15 provinces, autonomous regions and municipalities, and 192 county-level units, and ends in Hong Kong. The total length is 8704 kilometers.This bring new look to HDD Machine industry.
Industry Insight and News List: https://zlconnmachinery.com/technical-material-for-customer/industry-insight-and-news/
HUNAN ZLCONN ! SUPER QUALITY ONLY !
Ask HDD and Tools Price: Email: collaslu@zlconn.com
Whatsapp: 008618274950733